In practical terms, this means:
- Complete revision history with timestamps and editor names
- Read-only storage of original documents; corrections saved as traceable versions
- Links between documents, metering points, devices, and orders, so that a process can be reconstructed with a single click
- Retention for the entire relevant period, not just until the end of the project
- Access control policy and access logging
- Defined deletion policies for personal data
The operation of metering points is governed by the provisions of the Measurement and Calibration Act.
The following are particularly important:
- Evidence of conformity for the metering devices used
- Monitoring of calibration intervals
- Documentation of sampling procedures for extending calibration periods
- Timely planning of necessary meter replacements
- Traceable documentation of replacements and interventions
Reliable monitoring of calibration intervals is crucial to ensure that measurement values can be used for billing in a legally compliant manner.
- Interfaces to device management, billing, and market communication
- Transfer to the grid information system, where the facility is registered
- Transfer of wastewater treatment cases to a separate processing list
- Reports on inventory, calibration deadlines, defect rates, and throughput
What exactly does “audit-proof” mean?
That a process can be fully reconstructed later, unchanged and in a traceable manner. This includes a complete history, write protection on the originals, an access control policy, and retention for the entire relevant retention period. A collection of PDFs on a network drive does not meet these requirements.
How long is the calibration period for electricity meters?
Electricity meters with electronic measuring mechanisms have a calibration period of eight years, while meters with induction mechanisms have a calibration period of sixteen years. Under the sampling procedure specified by the Measurement Act (MessEG) and the Measurement Ordinance (MessEV), the calibration period for a batch can be extended without having to remove each individual meter. Such an extension is not indicated on the meter itself.
Will you use our system, or will you bring your own?
Both options are possible. If you are already using an existing solution, we will enter the data into it. If not, we will set up the data entry process and transfer the data via an agreed-upon interface.
What happens to existing paper records?
This information can be digitized and subsequently linked to a meter reading point and a device. This is particularly useful for transactions that are still within the retention period or that are relevant to active systems.
Is your meter documentation stored in three systems and one folder?
Then it’s worth taking stock. We’ll examine where data is generated today and where it gets lost, and propose a path toward end-to-end archiving.
Do you have any questions? We’d be happy to answer any questions you may have about digital documentation, audit-compliant storage, and metering point operations.